Tug boat haul 20 x 80ft weighting 100 tons moved for customer’s yard to the Southampton harbor where engine and cabin would be installed at the harbor.
Tug boat 60X16 ft weighing 110 tons moved from Southampton habour to the customer’s yard to be rebuilt.
Tug boat 60X16 ft weighing 110 tons moved from Southampton habour to the customer’s yard to be rebuilt.
Tug boat 60X16 ft weighing 110 tons moved from Southampton habour to the customer’s yard to be rebuilt.
Tug boat 60X16 ft weighing 110 tons moved from Southampton habour to the customer’s yard to be rebuilt.
Tug boat 60X16 ft weighing 110 tons moved from Southampton habour to the customer’s yard to be rebuilt.
Tug boat 60X16 ft weighing 110 tons moved from Southampton habour to the customer’s yard to be rebuilt.
Millwright work- Tank 14x70ft was moved over 200km from Milverton to Fort Erie.
YOM Plant in Barrie 60x90ft and 60ft high loading bay moved onsite to allow for expasnion of facility.
Millwright work- Tank 14x70ft was moved over 200km from Milverton to Fort Erie.
Works department shed for for Saugeen Township 32×48 was relocation to the far side of the property.